1. Baseline (no monitoring)
2. Preventive (time-based / greasing)
3. Vibration & thermography (phase 3)
4. RIA + cross-domain ESA (phase 1)
Electrical
Mechanical
Motor
Supply
Load
Occurrence
Occurrence
Severity
Severity
Baseline (no monitoring):
critical failure modes cluster near the center across all domains. Hover over any dot to inspect the failure mode and criticality score.